Natural Resource Fund – Annual Report 2023
Natural Resource Fund – Annual Report 2023
Public Accountability and Oversight Committee – Annual Report 2023
Public Accountability and Oversight Committee – Annual Report 2023
IHS Markit “Final” Audit Report for the Stabroek Block Cost Recovery Audit – 1999 – 2017
Executive Summary IHS Markit (IHSM) has been engaged by the Government of Guyana (GoG) to independently audit the cost recovery claim submission by Esso Exploration and Production Limited (EEPGL) for the period between 1999 and 2017 within the Stabroek Contract Area that amounts to a total of $1,677,774,727 in accordance with the prevailing Production Sharing […]
VHE’s “Initial” Audit Report for the Stabroek Block Cost Recovery Audit – 2018 to 2020
Introduction and BackgroundOn June 27, 2016, the Government of the Cooperative Republic of Guyana (GoG) entered into thePetroleum Agreement with Esso Exploration and Production Guyana Limited (EEPGL), CNOOCNexen Petroleum Guyana Limited, and Hess Guyana Exploration Limited for the purposes ofpetroleum operations and producing oil and gas in the offshore waters of Guyana. Esso, CNOOC,and Hess […]
Brief for OTC 2021
You can also read the document online by visiting the link below:
Gas to Power Project Summary
Update of the study on system Expansion of the Generation System
In order to identify guidelines for the development of the most adequate electrical infrastructure for generation and transmission expansion in the country, the Inter – American Development Bank (“IADB”) conducted in 2014 an Initial Study on System Expansion of the Generation and Transmission System of Guyana (“Initial Study”). An update of the Initial Study (“2016 […]
Gas to Shore
Guyana NG Feasibility Study Draft Final Report
(August 22, 2018) The Government of Guyana has partnered with the Inter-American Development Bank (IDB) to commission Energy Narrative to conduct a feasibility study of the planned offshore natural gas pipeline, the NGL separation and LPG production facility, and the natural gas-fired generation plant and related electricity infrastructure. The primary objective of the study is […]
Gas to Power Feasibility Study – Final Report Presentation
The objective of the study is to perform a comprehensive technical and economic assessment of gas to power generation options. The study addresses technical, economic, and financial aspects of gas fired power generation options.